A road-and-river logistics chain moves coal from the pit to a dedicated jetty for barge and vessel loading.
ROM coal excavated at the working faces.
2 units on record, stated capacity 400 trucks/day.
1.8 km access to a 30 m-wide provincial road, then 165 km to the jetty.
Jetty (PT PUS), 4.6 m draft, barge loading ≈ 6,000 MT/day (manual).
Muara Sabak, Jambi — vessel loading ≈ 8,000 MT/day WWD.

| Item | Recorded information |
|---|---|
| Hauling road | 1.8 km to provincial road |
| Road width | 30 m |
| Weighbridges | 2 units; stated capacity 400 trucks/day |
| Mine to jetty | 165 km |
| Jetty operator | PT PUS |
| Jetty capacity / draft | 7,500–8,000 MT; 4.6 m draft |
| Barge loading rate | 6,000 MT/day (manual) |
| Anchorage | Muara Sabak, Jambi |
| Vessel loading rate | 8,000 MT/day WWD |