About Us

MINE STATUS

IUP nomor 37 thn 2009

CNC no.26/Bb/03/2012.

ET no 03.ET.04.15.0073

LOGISTIC AND JETTY

Mine into jetty - 165 km
Name of the Jetty – PT PUS
Jetty capacity – 7500-8000 MTs. (draft 4.6m)
Barge Loading rate – 6000 Mts / day (mannual)
Anchorage point at Muara Sabak-Jambi.
Vessel loading rate 8000 MTs per day WWD SHINC

PRODUCTION & INFRASTUCTURE

Production capacity 100000-150000 per month.
Hauling road – 1.8km to province road
Width 30 m
Weighbridge 2 nos to handle 400 trucks per day.
Currently operating Pit 1 and pit 2 with reserves of 520.000 MT
Exposed area 5 ha

COAL QUALITY
COAL ANALYSIS
 
 

a